SHD / MC Checker

MC1079695 | Dynamics 365 Project Operations – Post expenses on the expense report posting date



MC1079695 | Dynamics 365 Project Operations – Post expenses on the expense report posting date

Classification stayInformed
Last Updated 05/22/2025 21:29:39
Start Time 05/21/2025 21:32:39
End Time 10/12/2025 21:32:00
Message Content We are announcing the ability to post expenses on the expense report posting date instead of the transaction date to enhance flexibility and accuracy in reporting in Dynamics 365 Project Operations. This feature will reach general availability in September 2025. A follow-up message will be published at that time to confirm availability.

How does this affect me?
The feature will provide administrators with a parameter on the Expense Management Parameters page. When this parameter is enabled, businesses will be able to post expense transactions on a specific posting date instead of the expense report date. This improves general ledger management, ensures sequential voucher numbering, and simplifies statutory compliance, resulting in more accurate financial reports.

What action do I need to take?
This message is for awareness and no action is required.

Machine Translation Dynamics 365 Project Operations でのレポートの柔軟性と精度を向上させるために、トランザクションの日付ではなく経費精算書の転記日に経費を転記する機能を発表します。この機能は、2025 年 9 月に一般提供される予定です。その時点で、空き状況を確認するためのフォローアップメッセージが公開されます。

これにはどのような影響がありますか?
この機能により、管理者は [経費管理パラメーター ] ページのパラメーターを利用できます。このパラメーターを有効にすると、企業は経費精算書の日付ではなく、特定の転記日に経費トランザクションを転記できます。これにより、総勘定元帳の管理が改善され、伝票の連番が付けられたり、法定コンプライアンスが簡素化されたりして、より正確な財務報告が可能になります。

どのような対応が必要ですか?
このメッセージは認識のためのものであり、アクションは必要ありません。