SHD / MC Checker

MC1143697 | Dynamics 365 Project Operations – Enable time phasing of quote and contract lines



MC1143697 | Dynamics 365 Project Operations – Enable time phasing of quote and contract lines

Classification stayInformed
Last Updated 08/28/2025 13:30:00
Start Time 08/28/2025 13:29:13
End Time 09/28/2025 13:29:13
Message Content We are announcing the ability to enable time phasing of quote and contract lines in Dynamics 365 Project Operations. This feature will reach general availability on September 30, 2025.

How does this affect me?

With this feature, correct sales and cost prices in quotes and contracts are automatically updated based on the effective date. This automation reduces the manual work needed to track and update prices. It also lowers the risk of errors and discrepancies in pricing.

The feature also enables you to keep a detailed audit trail of all changes made to quotes and contracts. This audit trail provides full transparency and traceability, for increased accuracy of pricing information.

You can view exact totals at any point in time, showing all current and historical pricing data.

What action do I need to take?

This message is for awareness, and no action is required.

If you would like more information on this feature, please visit Enable time phasing of quote and contract lines.

Machine Translation Dynamics 365 Project Operations で見積もりと契約品目の時間段階を有効にする機能を発表します。この機能は、2025 年 9 月 30 日に一般提供されます。

これは私にどのような影響を与えますか?
この機能を使用すると、見積と契約の正しい販売価格と原価価格は、発効日に基づいて自動的に更新されます。この自動化により、価格の追跡と更新に必要な手作業が削減されます。また、価格設定のエラーや不一致のリスクも軽減されます。

この機能を使用すると、見積もりと契約に加えられたすべての変更の詳細な監査証跡を保持することもできます。この監査証跡は、価格情報の精度を高めるために、完全な透明性とトレーサビリティを提供します。

任意の時点で正確な合計を表示でき、現在および過去のすべての価格データが表示されます。

どのようなアクションを実行する必要がありますか?
このメッセージは認識のためのものであり、アクションは必要ありません。

この機能の詳細については、「 見積もりと契約品目の時間フェーズを有効にする」を参照してください。