| MC1425968 | Dynamics 365 Project Operations – Configure Maximum Daily Time Entry Duration |
|---|
| Classification | stayInformed |
|---|---|
| Last Updated | 07/13/2026 10:22:13 |
| Start Time | 07/13/2026 10:21:22 |
| End Time | 08/13/2026 10:21:22 |
| Message Content | We are announcing the ability to configure maximum daily time entry duration in Dynamics 365 Project Operations. This feature will reach general availability on July 24, 2026.
How does this affect me? With this feature, admins can configure the maximum time that can be logged for time entry. This configuration can be applied from the Parameters page and will be checked each time a new time entry is created or modified. What action do I need to take? This message is for awareness, and no action is required. |
| Machine Translation | Dynamics 365 Project Operationsで最大1日のタイム入力時間を設定する機能を発表します。この機能は2026年7月24日に一般公開されます。
これが私にどう影響するのでしょうか? どんな対応を取ればいいのでしょうか? |