| MC1462628 | Dynamics 365 Project Operations – Post costs for manual transfer from the balance sheet |
|---|
| Classification | stayInformed |
|---|---|
| Last Updated | 08/27/2026 08:43:01 |
| Start Time | 08/27/2026 08:41:39 |
| End Time | 09/27/2026 08:41:39 |
| Message Content | We are announcing the ability to post costs for manual transfer from the balance sheet in Dynamics 365 Project Operations. This feature will reach public preview on September 11, 2026. How does this affect me? Organizations may have long running work for internal initiatives or customer facing projects. When cost and revenue profile rules are configured to post costs to the balance sheet (for example, as work in progress assets), there’s a point when those costs must be recognized as expenses. At that time, the amounts are reclassified from the balance sheet to the profit and loss statement. This feature enables manual movement of costs between the balance sheet and profit and loss statements. Enhancements include:
This feature is specific to customers using the Project Operations Integrated with ERP deployment type. What action do I need to take? This message is for awareness, and no action is required. If you would like more information on this feature, please visit Post costs for manual transfer from the balance sheet. |
| Machine Translation | 貸借対照表から手動移転費用を計上できる機能を発表します Dynamics 365 プロジェクトオペレーションにおいて。この機能は2026年9月11日にパブリックプレビューとなります。 これが私にどう影響するのでしょうか? この機能により、貸借対照表と損益計算書間でコストを手動で移動することが可能になります。改善点には以下が含まれます:
この機能は、 Project Operations Integrated with ERP 展開タイプを使用している顧客に特化しています。 どんな対応を取ればいいのでしょうか? この機能についてさらに詳しく知りたい方は、 貸借対照表からの手動移管費用の郵便ページをご覧ください。 |